GCS was commissioned to carry out a dimensional survey and structural assessment of the warehouse within the building compound. The client would like to use the first floor of the warehouse as a restaurant / café.

The building was found with suspended timber floor joists, historical steel beams and cast-iron columns.

Structural assessments are carried out to determine the capacity of the members to ensure they are suitable for the proposed usage. Strengthening works and details were proposed to specific structural elements.

Similar Posts

  • Matlock

    Project Information Project:Matlock Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the front porch and front retaining wall to the building. The client had concerns on the structural integrity of the front porch as the condition had noticeably deteriorated in the past decade. A specific…

  • Leisure Centre, Rotherham

    Project Information Project:Leisure Centre, Rotherham Category:Structural Survey Summary During refurbishment of the leisure complex it was reported that spalling concrete with exposed rebars were noted to the soffit of the concrete slab. We were asked to carry out an urgent non-intrusive specific structural survey to identify the defects, potential causes and provide recommendations. A report…

  • Doncaster

    Project Information Project:Doncaster Category:Specific Structural Survey Summary GCS was commissioned to carry out a specific structural survey for the property. The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

  • Sheffield

    Project Information Project:Sheffield Category:Structural Assessment Summary We were commissioned by the client to carry out a structural assessment of an existing steel beam within the building. The client has concerns on the existing detail and would like to ensure the existing steel beam has sufficient capacity. A site visit is carried out to capture the…