Building Inspection Sheffield

Project Information

Project:
Sheffield

Category:
Structural Assessment

Summary

We were commissioned by the client to carry out a structural assessment of an existing steel beam within the building. The client has concerns on the existing detail and would like to ensure the existing steel beam has sufficient capacity.

A site visit is carried out to capture the form of construction and dimensions for assessment.

Structural assessments are carried out to determine the capacity of the existing floor joists and steel members. Strengthening works and details are proposed to the underperformed structural elements.

Similar Posts

  • Leisure Centre, Rotherham

    Project Information Project:Leisure Centre, Rotherham Category:Structural Survey Summary During refurbishment of the leisure complex it was reported that spalling concrete with exposed rebars were noted to the soffit of the concrete slab. We were asked to carry out an urgent non-intrusive specific structural survey to identify the defects, potential causes and provide recommendations. A report…

  • Derby

    Project Information Project:Derby Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the building. The client has concerns about the structural integrity as various cracks were noticed to the external envelops and to the internal finishes. A specific structural survey report was produced to identify potential…

  • Doncaster

    Project Information Project:Doncaster Category:Specific Structural Survey Summary GCS was commissioned to carry out a specific structural survey for the property. The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

  • Retaining Wall Inspection

    Project Information Project:Retaining Wall Inspection Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the retaining walls within the building plot. Following the surveyor’s report, concerns were raised on the structural integrity of 4 no. of retaining walls. The retaining walls were situated in front and…

  • Brampton

    Project Information Project:Brampton Category:Structural Condition Survey Summary We were commissioned by the client to carry out a structural condition survey of the residential property. The building was erected with a double storey extension to the rear circa 1970. The building was found with a vertical crack at the interface between the original building and the…