Building Inspection Brampton

Project Information

Project:
Brampton

Category:
Structural Condition Survey

Summary

We were commissioned by the client to carry out a structural condition survey of the residential property.

The building was erected with a double storey extension to the rear circa 1970. The building was found with a vertical crack at the interface between the original building and the extension.

A survey report was produced to identify the cause of the cracks and recommendations to rectify the issue and extend the serviceable life of the structure components.

Similar Posts

  • Retaining Wall Inspection

    Project Information Project:Retaining Wall Inspection Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the retaining walls within the building plot. Following the surveyor’s report, concerns were raised on the structural integrity of 4 no. of retaining walls. The retaining walls were situated in front and…

  • Claycross

    Project Information Project:Claycross Category:Dimensional Survey and Structural Assessment Summary GCS was commissioned to carry out a dimensional survey and structural assessment of the warehouse within the building compound. The client would like to use the first floor of the warehouse as a restaurant / cafĂ©. The building was found with suspended timber floor joists, historical…

  • Green End, Whitchurch

    Project Information Project:Green End, Whitchurch Category:Structural Condition Survey Summary The structure is a series of mixed used, commercial properties. Located in Whitchurch centre, the building is a two-storey high structural fronting Green End and a series of single storey structures to the rear of Green End. The proposal is to covert the first floor into…

  • Sheffield

    Project Information Project:Sheffield Category:Structural Assessment Summary We were commissioned by the client to carry out a structural assessment of an existing steel beam within the building. The client has concerns on the existing detail and would like to ensure the existing steel beam has sufficient capacity. A site visit is carried out to capture the…

  • Doncaster

    Project Information Project:Doncaster Category:Specific Structural Survey Summary GCS was commissioned to carry out a specific structural survey for the property. The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

  • Derby

    Project Information Project:Derby Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the building. The client has concerns about the structural integrity as various cracks were noticed to the external envelops and to the internal finishes. A specific structural survey report was produced to identify potential…