Building Inspection Doncaster

Project Information

Project:
Doncaster

Category:
Specific Structural Survey

Summary

GCS was commissioned to carry out a specific structural survey for the property.

The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

Similar Posts

  • Retaining Wall Inspection

    Project Information Project:Retaining Wall Inspection Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the retaining walls within the building plot. Following the surveyor’s report, concerns were raised on the structural integrity of 4 no. of retaining walls. The retaining walls were situated in front and…

  • Claycross

    Project Information Project:Claycross Category:Dimensional Survey and Structural Assessment Summary GCS was commissioned to carry out a dimensional survey and structural assessment of the warehouse within the building compound. The client would like to use the first floor of the warehouse as a restaurant / cafĂ©. The building was found with suspended timber floor joists, historical…

  • Green End, Whitchurch

    Project Information Project:Green End, Whitchurch Category:Structural Condition Survey Summary The structure is a series of mixed used, commercial properties. Located in Whitchurch centre, the building is a two-storey high structural fronting Green End and a series of single storey structures to the rear of Green End. The proposal is to covert the first floor into…

  • Derby

    Project Information Project:Derby Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the building. The client has concerns about the structural integrity as various cracks were noticed to the external envelops and to the internal finishes. A specific structural survey report was produced to identify potential…