Wellbeing Centre, Chesterfield

Building Inspection Wellbeing Centre

Project Information

Project:
Wellbeing Centre, Chesterfield

Category:
Structural Condition Report

Summary

The building is a two storey high detached building with a two storey front extension. The construction date of the building is not known, however the building is expected to be built circa 1800s behind the Congregational Chapel and was used as a Sunday School until 1880. The Congregational Chapel was demolished. The last known occupant was a commercial vehicle rental and the building was used as an office until circa 2017.

The building has been strengthened in the past, with 6no. anchor plates visible to the front and rear wall of the original building. This indicates that 3no. of tie rods were installed to avoid spreading of the front and rear wall. The date of when the strengthening work was carried out is not known.

The elevations of the building are faced with stones. The original roof is in the form of a vaulted ceiling, with 3no. timber roof trusses where only the bottom chord is visible. There are 2no. access hatches to the original ceiling. The vaulted ceiling comprises loose ceiling joists with ceiling binders. The roof comprises loss timber rafters with timber purlins providing support to slate roof tiles.

Externally, to the front of the building is a paved courtyard and footpath. External steps are located to the front of the building, providing access from the footpath to the front courtyard. A narrow driveway is located to the left of the building, providing access to the properties to the rear of the building. River Hipper is located immediately to the right of the building, with water flowing from north to south and turns to the back of the properties to the rear of the building.

Our scope is to carry out a structural condition survey of the building to capture any defects and to provide recommendations for remedial works. The Structural Condition report was sent to the client and to MJB Technical Services to discuss the findings and the options to move forward.

Similar Posts

  • Abergavenny

    Project Information Project:Abergavenny Category:Structural Site Visit Summary We were commissioned by the client to carry out a site visit to determine the position of the load bearing walls. During the site visit, further advice and recommendations were given regarding the condition and safety of the structure.

  • Claycross

    Project Information Project:Claycross Category:Dimensional Survey and Structural Assessment Summary GCS was commissioned to carry out a dimensional survey and structural assessment of the warehouse within the building compound. The client would like to use the first floor of the warehouse as a restaurant / cafĂ©. The building was found with suspended timber floor joists, historical…

  • Derby

    Project Information Project:Derby Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the building. The client has concerns about the structural integrity as various cracks were noticed to the external envelops and to the internal finishes. A specific structural survey report was produced to identify potential…

  • Brampton

    Project Information Project:Brampton Category:Structural Condition Survey Summary We were commissioned by the client to carry out a structural condition survey of the residential property. The building was erected with a double storey extension to the rear circa 1970. The building was found with a vertical crack at the interface between the original building and the…