Retaining Wall Inspection

Building Inspection Retaining Walls

Project Information

Project:
Retaining Wall Inspection

Category:
Specific Structural Survey

Summary

We were commissioned by the client to carry out a specific structural survey of the retaining walls within the building plot.

Following the surveyor’s report, concerns were raised on the structural integrity of 4 no. of retaining walls. The retaining walls were situated in front and rear of the building, ranging from 1.2m to 6m in height.

A specific structural survey report was produced to identify potential defects and to recommend remedial solutions.

Similar Posts

  • Doncaster

    Project Information Project:Doncaster Category:Specific Structural Survey Summary GCS was commissioned to carry out a specific structural survey for the property. The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

  • Abergavenny

    Project Information Project:Abergavenny Category:Structural Site Visit Summary We were commissioned by the client to carry out a site visit to determine the position of the load bearing walls. During the site visit, further advice and recommendations were given regarding the condition and safety of the structure.

  • Matlock

    Project Information Project:Matlock Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the front porch and front retaining wall to the building. The client had concerns on the structural integrity of the front porch as the condition had noticeably deteriorated in the past decade. A specific…

  • Sheffield

    Project Information Project:Sheffield Category:Structural Assessment Summary We were commissioned by the client to carry out a structural assessment of an existing steel beam within the building. The client has concerns on the existing detail and would like to ensure the existing steel beam has sufficient capacity. A site visit is carried out to capture the…