Building Inspection Doncaster

Project Information

Project:
Doncaster

Category:
Specific Structural Survey

Summary

GCS was commissioned to carry out a specific structural survey for the property.

The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

Similar Posts

  • Claycross

    Project Information Project:Claycross Category:Dimensional Survey and Structural Assessment Summary GCS was commissioned to carry out a dimensional survey and structural assessment of the warehouse within the building compound. The client would like to use the first floor of the warehouse as a restaurant / cafĂ©. The building was found with suspended timber floor joists, historical…

  • Abergavenny

    Project Information Project:Abergavenny Category:Structural Site Visit Summary We were commissioned by the client to carry out a site visit to determine the position of the load bearing walls. During the site visit, further advice and recommendations were given regarding the condition and safety of the structure.

  • Derby

    Project Information Project:Derby Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the building. The client has concerns about the structural integrity as various cracks were noticed to the external envelops and to the internal finishes. A specific structural survey report was produced to identify potential…

  • Leisure Centre, Rotherham

    Project Information Project:Leisure Centre, Rotherham Category:Structural Survey Summary During refurbishment of the leisure complex it was reported that spalling concrete with exposed rebars were noted to the soffit of the concrete slab. We were asked to carry out an urgent non-intrusive specific structural survey to identify the defects, potential causes and provide recommendations. A report…