Building Inspection Doncaster

Project Information

Project:
Doncaster

Category:
Specific Structural Survey

Summary

GCS was commissioned to carry out a specific structural survey for the property.

The building was found to be subjected to subsidence and a structural inspection was carried out to identify the potential cause. Recommendations were provided in the report the rectify the defects.

Similar Posts

  • Retaining Wall Inspection

    Project Information Project:Retaining Wall Inspection Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the retaining walls within the building plot. Following the surveyor’s report, concerns were raised on the structural integrity of 4 no. of retaining walls. The retaining walls were situated in front and…

  • Matlock

    Project Information Project:Matlock Category:Specific Structural Survey Summary We were commissioned by the client to carry out a specific structural survey of the front porch and front retaining wall to the building. The client had concerns on the structural integrity of the front porch as the condition had noticeably deteriorated in the past decade. A specific…

  • Green End, Whitchurch

    Project Information Project:Green End, Whitchurch Category:Structural Condition Survey Summary The structure is a series of mixed used, commercial properties. Located in Whitchurch centre, the building is a two-storey high structural fronting Green End and a series of single storey structures to the rear of Green End. The proposal is to covert the first floor into…

  • Brampton

    Project Information Project:Brampton Category:Structural Condition Survey Summary We were commissioned by the client to carry out a structural condition survey of the residential property. The building was erected with a double storey extension to the rear circa 1970. The building was found with a vertical crack at the interface between the original building and the…